Case Studies

Real-world success stories demonstrating how AngleLock structural systems solve critical engineering challenges across high-performance industries.

Aerospace & Defense

Satellite Assembly Fixture Platform

Major aerospace contractor needed a 12'x20' vibration-isolated platform for satellite integration with micron-level precision requirements.

The Challenge

Micron-level precision for satellite assembly

Key Results

  • < 5 micron deflection under 2,000 lb load
  • Reconfiguration time: 2 days → 4 hours
  • 8 reconfigurations over 3 years
  • Zero maintenance since installation
Life Sciences

Pharmaceutical Manufacturing Equipment Base

Pharmaceutical manufacturer required equipment base for ISO Class 7 cleanroom supporting 3,500 lb bioprocessing equipment.

The Challenge

ISO Class 7 cleanroom compatibility with frequent relocations

Key Results

  • Passed ISO 14644-1 Class 7 certification
  • Relocated 3 times in 18 months
  • Withstands daily chemical washdowns
  • Installation: 6 hours vs 2 days
Semiconductor

Wafer Inspection System Base

Leading semiconductor manufacturer needed vibration-isolated base for automated optical inspection system in Class 1 cleanroom.

The Challenge

< 1 micron vibration spec in Class 1 cleanroom

Key Results

  • 0.3 micron vibration (70% below spec)
  • 36-hour installation with qualification
  • Zero particle generation
  • 24/7 operation for 2+ years
Robotics & Automation

Collaborative Robot Assembly Cell

Automotive supplier needed flexible assembly cell with 2 cobots and vision inspection that could be reconfigured weekly.

The Challenge

Weekly reconfigurations while maintaining calibration

Key Results

  • Reconfiguration: 8 hours → 45 minutes
  • Calibration maintained through 50+ reconfigs
  • 3x improvement in vision repeatability
  • 12 product families supported
General Industrial

CNC Machine Tool Base

Job shop needed mobile base for 8,000 lb CNC mill that could be relocated as floor layout changed.

The Challenge

Heavy machinery with vibration isolation and mobility

Key Results

  • Supports 8,000 lbs with zero deflection
  • 40% reduction in part rejection rate
  • Relocated 4 times in 2 years
  • Saturday install, Monday production

Ready to Start Your Success Story?