Satellite Assembly Fixture Platform
Major aerospace contractor needed a 12'x20' vibration-isolated platform for satellite integration with micron-level precision requirements.
The Challenge
Micron-level precision for satellite assembly
Key Results
- < 5 micron deflection under 2,000 lb load
- Reconfiguration time: 2 days → 4 hours
- 8 reconfigurations over 3 years
- Zero maintenance since installation
Pharmaceutical Manufacturing Equipment Base
Pharmaceutical manufacturer required equipment base for ISO Class 7 cleanroom supporting 3,500 lb bioprocessing equipment.
The Challenge
ISO Class 7 cleanroom compatibility with frequent relocations
Key Results
- Passed ISO 14644-1 Class 7 certification
- Relocated 3 times in 18 months
- Withstands daily chemical washdowns
- Installation: 6 hours vs 2 days
Wafer Inspection System Base
Leading semiconductor manufacturer needed vibration-isolated base for automated optical inspection system in Class 1 cleanroom.
The Challenge
< 1 micron vibration spec in Class 1 cleanroom
Key Results
- 0.3 micron vibration (70% below spec)
- 36-hour installation with qualification
- Zero particle generation
- 24/7 operation for 2+ years
Collaborative Robot Assembly Cell
Automotive supplier needed flexible assembly cell with 2 cobots and vision inspection that could be reconfigured weekly.
The Challenge
Weekly reconfigurations while maintaining calibration
Key Results
- Reconfiguration: 8 hours → 45 minutes
- Calibration maintained through 50+ reconfigs
- 3x improvement in vision repeatability
- 12 product families supported
CNC Machine Tool Base
Job shop needed mobile base for 8,000 lb CNC mill that could be relocated as floor layout changed.
The Challenge
Heavy machinery with vibration isolation and mobility
Key Results
- Supports 8,000 lbs with zero deflection
- 40% reduction in part rejection rate
- Relocated 4 times in 2 years
- Saturday install, Monday production